不卡av有线观看|黄色边缘调教在线观四虎国产看网站|日本口爆视频久久久久久久久久久|国产一区无码|91夫妻英文丝袜|欧美日韩a级大片|狼友免费网站69热在线视频|手机欧美日韩一区二区|日韩熟妇精品视频|日韩欧美亚洲影音

The 9.0 MT/a dry coal preparation plant of NewShanghai No. 1 coal mine of Shanghaimiao mining company was put into operation in November 2019, and the raw coal is lignite. The completion of dry coal preparation plant has completely solved the problem of separation of -30mm fine coal. After separation, the calorific value of commercial coal is increased by 500kcal/kg, the sulfur content is reduced from 2.1% to less than 1%, and the desulfurization rate is 50%. The project is the largest wellhead dry coal preparation project in the world, and it is also a model of Shenzhou Group's investment, construction and contracted operation project.


ITEM

yield Wt%

ASH Ad% 

sulfur Std%

NET CALORIFIC VALUE Qnet,ar,Kcal/kg  

RAW COAL

100

30.95

2.91

3391

CLEAN COAL

81.28

21.69

1.05

3870

REJECT

18.72

71.15

11.01

1310

XINSHANGHAI NO.1 MINE OF SHANGHAIMIAO MINING COMPANY OF LINKUANG GROUP OF SHANDONG ENERGY

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE